Follow the proposed path of the Central Rail Line Extension

The extension to the Central Rail Line will run 8/10 of a mile from 30th•Downing and connect with the East Rail Line station that is under construction at 38th•Blake.

It will have two additional walk-up stations at 33rd•Downing and 35th•Downing.

Click on the icons on the map below and see descriptions and photos of highlights along the route.