 Rail Removal Summer 2007 |  Rail Removal |  Column Aesthetics- Indiana Bridge 11/09 |
 WC Bridge Abutment Aesthetics- Colfax Bridge 8/09 |  Bridge Pier Aesthetics- Hazel Ct. Pedestrian Bridge 9/09 |  Grading Work Indiana to Union 9/09 |  MSE Walls from Indiana to Union 9/09 |  Knox Ct. MSE Wall Construction 9/09 |  Wadsworth Bridge Columns 1/10 |  Denver Property Demolition 2/10 |  Retaining Walls- Indiana to Colfax 2/10 |  Welding Rail 1/10 |  Wadsworth East Walls 4/10 |  Grading Operations 4/10 |  Indiana Bridge Girder Placement 5/10 |  Howard, Morrison, Decatur Reconstruction 07/10 |  Soundsorb Sample 7/10 |  Soundwall with Soundsorb 7/10 |  Soundwall without Soundsorb 7/10 |  Rail Welding & Moving 8/10 |  6th Ave. Ballast Walls Looking East 8/10 |  Sheridan Bridge Rail Storage 9/10 |  Final Soundwalls 9/10 |  South Platte Bridge Bolts Closeup 9/10 |  South Platte Bridge Bolts Closeup 9/10 |  Rail Closeup 9/10 |  Ballast & Rail: Indiana - Union 10/10 |  Ballast & Rail: Sheridan - Perry 10/10 |  Guideway Foundations: Simms - Quail |  Early Track Construction: Sheridan - Perry 10/10 |  Early Track Construction: Sheridan - Perry 10/10 |  Rail Spur West of I-25 10/10 |  Ballast & Rail: Collins- Quail 11/10 |  Preliminary Track: Sheridan - Perry 11/10 |  Skeleton Track: Indiana - Union 12/10 |  Skeleton Track: Indiana - Union 12/10 |  Guideway Construction: I-70 - Indiana 12/10 |  Skeleton Track: 8th Avenue - Collins Street 12/10 |  Substation at Colfax 12/10 |  Indiana Bridge Plinth Installation 1/11 |  Ballast Installation: Indiana - Union 1/11 |  Skeleton Track: Colfax Avenue - I-70 Tunnel 2/11 |  Plinth Installation on the Indiana Bridge 12/10 |  Indiana Bridge Plinth Installation 12/10 |  Colfax Bridge Plinth Installation 2/11 |  Dragging Rail: Kipling Bridge 02/11 |  Burnham Yard Lead: Union Pacific Track Re-route 02/11 |  Traction Power Substation Placement 8/11 |  Ballast Distribution: Ulysses - Colfax 03/11 |  Plinth Construction on the Colfax Bridge 03/11 |  Track: Colfax - Ulysses 03/11 |  Sound Walls East of Wadsworth 04/11 |  Light Rail Guideway: Estes - Garrison 04/11 |  Light Rail Guideway: Independence - Estes Street 04/11 |  Light Rail Guideway: Kipling - Oak 04/11 |  Light Rail Guideway: Kipling - Independence Street 04/11 |  Light Rail Guideway West of Wadsworth 04/11 |  Overhead Catenary System at Red Rocks 6/11 |  CML Catenary Poles 7/11 |  CML Catenary Poles 7/11 |  8th Avenue Construction 8/11 |  8th Avenue Construction 8/11 |  Track Leading to South Platte River Bridge 8/11 |  Systems Work 8/11 |  Zuni Grade Crossing Construction 8/11 |  Track Construction into Federal Center Station 8/11 |  Signal Work at Collins Street 8/11 |  Shoshone Street At Grade Crossing 8/11 |  Catenary Poles on Kipling Bridge 8/11 |  Light Rail Line East of Kipling Bridge 8/11 |  Trackwork at South Platte River 9/11 |  Inside Track Power Sub Station 9/11 |  TPSS at Juniper Street 9/11 |  Track from Sheridan West 9/11 |  Relay House at Decatur Street 9/11 |  Substation Installation at Juniper 9/11 |  Catenary Installation near Collins Street 9/11 |  Track Work Perry-Knox 10/11 |  Independence St. with installed overhead catenary systems 10/11 |  South Platte Bridge rail installation complete 10/11 |  13th Ave. Harlan - Lamar |  Catenary Poles at 8th Avenue 11/11 |  Estes Track Crossing with Catenary Poles 11/11 |  Track Leading to South Platte Bridge 11/11 |  Track Leading to South Platte Bridge 11/11 |  Catenary Poles Along West Rail Line 12/11 |  TPSS at Oak Station 12/11 |  Track through Jeffco Garage Tunnel 12/11 |